How to Build a Compliant Accounting Department for UAE Contractors

Table of Contents

bookkeeping, accounting, taxes, settlement, calculator, money, business, finance, billing, documents, office, desk, secretariat, macbook, binder, folders, bookkeeping, bookkeeping, bookkeeping, accounting, accounting, accounting, accounting, accounting, taxes, calculator, money, money, money, finance, finance, finance, finance, billing
Finance Guide

Accounting for UAE Contractors:
FTA-Compliant Finance Function Blueprint

A field-tested blueprint for contractors in the UAE to design a finance function that's audit-ready, FTA-compliant, and built for margin protection.

Updated Feb 2026 12 min read
5% of UAE GDP from construction
3.5% projected annual sector growth
72% contractors flag VAT pain points
9% UAE Corporate Tax headline rate

Why Accounting Is Mission-Critical for UAE Contractors

For every construction or contracting company in the UAE, accounting is the backbone of sustainability. Unlike retail businesses with straightforward sales cycles, contractors juggle long-term projects, variable cash flow, and complex VAT obligations. Without strong accounting controls, even profitable projects can slip into losses.

πŸ’‘ Pro Insight

Contractors with robust accounting departments report 37% fewer payment disputes and 52% faster project profitability analysis than those using basic bookkeeping.

Operational Impact β€” Turning Paperwork into Profit

A disciplined accounting department brings structure to site operations. It ensures timely payroll management, controlled procurement, and precise job costing so every dirham spent is traceable.

  • Transparent expense allocation prevents overruns and supports smarter bidding
  • Real-time project tracking identifies cost leaks before they impact margins
  • Automated workflows reduce manual errors and speed up month-end close

Understanding Construction Accounting vs. General Accounting

While general accounting focuses on business-wide performance, construction accounting operates at the project level. Every job becomes a mini profit center, requiring specialized tracking methods that traditional retail or service businesses don't need.

Key Differences That Matter

Construction accounting diverges from general accounting in five critical ways:

  • Job Costing: Each project tracks costs separately β€” materials, labor, equipment, and subcontractors are allocated to specific job codes
  • Retainage Accounting: 5-10% of contract value is typically withheld until project completion, creating unique AR/AP dynamics
  • Progress Billing: Revenue is invoiced based on work completion milestones, not delivery of finished goods
  • Change Order Management: Contract variations must be tracked separately to measure impact on original budget vs. actual
  • WIP Schedules: Work-in-progress reports reconcile costs incurred versus revenue recognized for unfinished projects

πŸ’Ό Industry Insight

UAE contractors using project-based accounting systems report 43% better budget adherence compared to those using generic accounting software. The difference: real-time job costing visibility.

The Retainage Challenge

Retainage (or "retention money") is common in UAE construction contracts. Clients withhold 5-10% of each progress payment as security. This creates two accounting complications:

  • You've earned the revenue and incurred the costs, but cash doesn't arrive for months (or years)
  • VAT on retention is due when payment is released, not when the original invoice was issued
  • Retention receivables must be tracked separately from standard accounts receivable

Failure to properly account for retention can distort your balance sheet and create phantom profits.

Revenue Recognition for Contractors (IFRS 15)

The UAE mandates IFRS 15 β€” Revenue from Contracts with Customers for all construction companies. This standard replaced the old IAS 11 (Construction Contracts) and fundamentally changed how contractors recognize revenue.

The Five-Step Model

IFRS 15 requires a systematic approach to revenue recognition. Every construction project must pass through these five steps:

Identify the Contract with a Customer

A valid contract must have:

  • Commercial substance (parties are committed to perform)
  • Approval from both parties (written or verbal)
  • Clearly defined rights regarding goods/services
  • Identifiable payment terms
  • High probability of collecting payment

Identify Separate Performance Obligations

Break down the contract into distinct deliverables. For contractors, this might be:

  • Structural work (foundation, columns, slabs)
  • MEP installation (electrical, plumbing, HVAC)
  • Interior fit-out and finishing
  • Landscaping or external works

Each must be separately identifiable and provide distinct value to the customer.

Determine the Transaction Price

Calculate the total consideration you expect to receive, including:

  • Fixed contract price
  • Variable consideration (bonuses, penalties, change orders)
  • Time value of money (if payment is significantly deferred)
  • Non-cash consideration (e.g., land swaps)

Allocate the Transaction Price

Distribute the total price across each performance obligation based on relative standalone selling prices. Use:

  • Adjusted market assessment approach
  • Expected cost plus margin approach
  • Residual approach (when standalone price is uncertain)

Recognize Revenue Over Time

For construction contracts, revenue is recognized as work progresses using the percentage of completion method:

  • Input Method: Based on costs incurred vs. total expected costs
  • Output Method: Based on milestones achieved, units completed, or surveys of work performed

Formula: Revenue to Recognize = (Costs Incurred Γ· Total Expected Costs) Γ— Contract Value

πŸ“˜ Practical Example

Project: AED 10,000,000 villa construction contract
Costs incurred to date: AED 3,000,000
Total estimated costs: AED 8,000,000
Percentage complete: 3,000,000 Γ· 8,000,000 = 37.5%
Revenue recognized: AED 10,000,000 Γ— 37.5% = AED 3,750,000

Common Revenue Recognition Mistakes

  • Recognizing full contract value upfront (violates IFRS 15)
  • Failing to account for variable consideration (penalties or bonuses)
  • Not updating percentage of completion for cost overruns
  • Misallocating indirect costs to projects

Project Costing Methods for UAE Contractors

Accurate project costing is the foundation of profitable contracting. In the UAE's competitive construction market, even a 5% estimation error can turn a winning bid into a loss-making project.

Three Levels of Cost Estimation

Contractors use different estimation techniques depending on the project stage:

  • Conceptual Estimating: High-level ballpark figures based on historical data from similar projects (Β±25% accuracy). Used during feasibility and initial bidding phases.
  • Parametric Estimating: Statistical models using cost-per-square-meter for specific building types (Β±15% accuracy). Common in Dubai where cost data is available for villas, towers, offices.
  • Detailed Unit-Cost Estimating: Granular breakdown pricing every material, labor hour, and equipment piece (Β±5% accuracy). Mandatory for final bids and contract execution.

Essential Cost Components

Every UAE construction project must account for these six cost categories:

  • Materials: Concrete, steel, MEP equipment β€” typically 40-50% of total project cost. Track delivered costs including customs, logistics.
  • Direct Labor: Site workers, supervisors, engineers allocated to specific projects. Include WPS-compliant salaries, overtime, and EOSB provisions.
  • Equipment: Rental or depreciation of cranes, excavators, concrete pumps. Factor in mobilization and demobilization costs.
  • Subcontractors: Specialized trades (MEP, faΓ§ade, landscaping). Include retention obligations in your cash flow projections.
  • Indirect Costs (Overheads): Site office, utilities, insurance, permits. Allocate proportionally across projects using driver-based methods.
  • Contingency (5-10%): Buffer for unknowns β€” site conditions, material price escalation, design changes. Critical in UAE's fast-moving market.

πŸ“Š Cost Allocation Best Practice

Leading UAE contractors use activity-based costing (ABC) to allocate overheads. Instead of spreading costs evenly, allocate based on actual consumption drivers: labor hours for HR costs, equipment hours for maintenance, invoice count for procurement overhead.

Real-Time Cost Tracking

Implement these controls for continuous cost visibility:

  • Weekly cost vs. budget variance reports at project level
  • Automated alerts when spending exceeds Β±10% of budget line items
  • Material consumption tracking tied to work-in-progress (WIP) reports
  • Subcontractor payment applications verified against completed work certificates

Integrate your accounting software with procurement and project management tools for real-time visibility.

Building a Functional Accounting Department

A truly compliant accounting department in the UAE construction sector is not a single role β€” it's a specialized ecosystem. It blends people, technology, and controls designed to handle complex project finances.

Payables & Procurement Management

Control supplier obligations with three-way matching (PO β†’ GRN β†’ Invoice), maintain TRN validation for VAT recovery, and implement dual approval for payments above AED 50,000.

  • Automated supplier statement reconciliation
  • Early payment discount tracking
  • Aging analysis for cash planning

Receivables & Progress Billing

Manage complex progress billing workflows, track retention money separately, and ensure revenue recognition aligns with work completion certificates.

  • Automated payment reminder system
  • Client-wise DSO tracking
  • Integration with project management tools

Payroll & Workforce Accounting

Handle WPS compliance, end-of-service gratuity provisioning, and site-based cost allocation for accurate project margins.

  • Monthly EOSB provisioning
  • Overtime tracking by project
  • Labor cost variance analysis

Project Costing & Budget Control

Track budgets vs. actuals in real-time, allocate indirect costs via driver-based allocation, and produce project-wise P&L statements monthly.

  • Budget variance alerts (+/- 10%)
  • Material consumption tracking
  • Subcontractor cost verification

Compliance, VAT & Corporate Tax Control

Maintain 5-year digital records, prepare monthly VAT returns, and calculate Corporate Tax provisions under the 9% regime.

  • Quarterly CT provision calculation
  • Input VAT recoverability checks
  • FTA audit file preparation

Selecting the Right Accounting Software

UAE contractors need specialized accounting systems that go beyond basic bookkeeping. Generic software can't handle job costing, retention tracking, or progress billing β€” the hallmarks of construction finance.

Essential Features for Contractor Accounting Systems

  • Project-Level Job Costing: Track materials, labor, equipment, and subcontractors per project with drill-down capability
  • Progress Billing & Retainage: Automate percentage-of-completion invoicing and separate retention receivables/payables
  • Subcontractor Management: Contract tracking, payment applications, retention releases, and compliance documentation
  • VAT/CT Compliance: Auto-generate FTA-compliant tax invoices, track input/output VAT, and produce VAT 201 returns
  • WPS Integration: Direct integration with UAE Wage Protection System for payroll compliance
  • < strong>Multi-Currency: Handle foreign suppliers (especially important for MEP equipment imports)
  • Real-Time Dashboards: Project profitability, cash flow forecasts, budget vs. actual at management fingertips

πŸ’» FTA-Accredited Software

The Federal Tax Authority maintains a list of accredited accounting software vendors for VAT compliance. While not mandatory, using accredited software reduces audit friction and ensures your VAT calculations align with FTA standards.

ERP vs. Standalone Accounting Software

Larger contractors (AED 50M+ annual revenue) typically need full ERP systems integrating procurement, project management, HR, and finance. Smaller contractors can succeed with cloud-based construction accounting software that integrates with best-of-breed tools.

Cash Flow Management for Contractors

Construction companies can be profitable on paper yet fail due to cash flow crises. The industry's payment cycles β€” retention holds, progress billing delays, upfront material costs β€” create unique liquidity challenges.

The Cash Flow Timing Problem

Unlike retail businesses that collect payment at sale, contractors face:

  • 30-60 day payment terms on progress invoices (after client approval)
  • 5-10% retention withheld until project completion or defects liability period
  • Upfront material purchases (cement, steel) with 7-14 day supplier payment terms
  • Bi-weekly payroll obligations regardless of client payment status

This creates negative cash cycles where you pay expenses before collecting revenue.

13-Week Cash Flow Forecasting

Best-practice contractors maintain rolling 13-week cash forecasts updated weekly:

  • Week 1-4: Actual committed amounts (POs issued, invoices received, confirmed payments)
  • Week 5-8: High-probability items (material deliveries scheduled, approved progress certificates)
  • Week 9-13: Projected based on project schedules and historical patterns

⚠️ Red Flag: Negative Cash Runway

If your 13-week forecast shows cash balance dropping below AED 500,000 (or 1 month of operating expenses), take immediate action: accelerate collections, delay non-critical spending, negotiate extended payment terms with suppliers, or arrange overdraft facilities.

Collection Strategies

Proactive receivables management is non-negotiable:

  • Submit progress certificates on time (don't give clients excuses to delay)
  • Follow up on pending approvals within 48 hours
  • Escalate overdue invoices: email at 7 days, phone call at 14 days, formal notice at 21 days
  • Maintain project handover leverage β€” don't release final deliverables until retention is settled

Managing Change Orders & Variations

Nearly every UAE construction project experiences scope changes. Proper change order management protects your margins and prevents disputes.

Change Order Documentation Process

Follow this workflow for every variation:

  • 1. Identify Change: Site instruction, design revision, client request, or unforeseen condition
  • 2. Assess Impact: Calculate cost delta (materials, labor, equipment, time extension)
  • 3. Submit Proposal: Formal change order request with itemized costs and schedule impact
  • 4. Obtain Approval: Written sign-off from client (email confirmation minimum, signed variation order ideal)
  • 5. Update Budget: Revise project budget and forecast in accounting system
  • 6. Track Separately: Code all change order costs to separate GL accounts for margin analysis

🎯 Margin Protection Tip

Track change order profit margins separately from base contract margins. Many contractors discover they're earning 15% on the original scope but only 5% on variations β€” because they underestimate true costs during change negotiations.

Revenue Recognition for Change Orders

Under IFRS 15, only recognize change order revenue when:

  • Both parties have approved the scope and price (verbal approval is risky)
  • It's probable you'll collect payment
  • You can reliably estimate the costs

Don't recognize "claim revenue" β€” disputed variations where price negotiation is ongoing.

Subcontractor Accounting & Management

Subcontractors typically represent 30-50% of total project costs for UAE general contractors. Proper subcontractor accounting prevents payment disputes, ensures compliance, and protects cash flow.

Subcontractor Payment Cycle

Mirror your client's payment structure with subcontractors:

  • Progress Applications: Subcontractors submit monthly payment applications based on work completed
  • Verification: Your site team verifies quantities and quality before approval
  • Retention: Withhold 5-10% until project completion (same retention % client holds from you)
  • Payment Terms: Net 30-45 days from approval (don't extend beyond your client's payment terms)

VAT on Subcontractor Payments

Key VAT considerations:

  • Verify subcontractor has valid VAT TRN (Tax Registration Number) before appointment
  • Obtain tax invoices for all payments (invoice + retention release)
  • Reverse charge mechanism may apply for services from foreign subcontractors
  • Track input VAT separately per project for accurate recoverability

Compliance Documentation

Maintain these documents in your subcontractor files:

  • Valid trade license copy
  • Insurance certificates (public liability, professional indemnity)
  • WPS compliance certificate (if subcontractor has employees)
  • Performance bond or bank guarantee (for high-value subcontracts)
  • Signed subcontract agreement with clear scope, payment terms, retention clauses

VAT & Corporate Tax Compliance

Tax compliance is a cornerstone of sustainable growth for UAE contractors. Proper VAT registration, periodic filing, and Corporate Tax reporting ensure your company stays compliant with FTA standards.

Understanding VAT for Contractors

Contractors operate in a high-volume, multi-stakeholder ecosystem. VAT applies to most supplies at the standard 5% rate, but progress invoicing and retention billing create timing complexities.

⚠️ Common Mistake

VAT on Retention: Many contractors incorrectly charge VAT on retention amounts at invoice issuance. Correction: VAT is due only when the retention payment is actually released.

Corporate Tax (CT) for UAE Contractors

Since 2023, UAE businesses exceeding AED 375,000 in annual profits are subject to a 9% Corporate Tax. Contractors must calculate taxable income based on adjusted accounting profits.

Audit & Internal Controls

A well-defined internal control system safeguards your contracting business from financial errors, fraud, and non-compliance. Whether you're preparing for an FTA VAT audit or an annual statutory review, having structured workflows ensures transparency.

πŸ“‹ FTA Record-Keeping Compliance

The FTA requires that all financial records and supporting documents be kept for at least 5 years from the end of each tax period. This includes project-wise expense ledgers, supplier agreements, and client invoices.

2026 Compliance Calendar & Regulatory Updates

UAE contractors face significant regulatory changes in 2026. Staying ahead of compliance deadlines protects your business from penalties and operational disruptions.

Dubai Construction Law No. 7 of 2025

A transformative new contracting law took effect in Dubai on January 1, 2026, introducing a classification system that ranks contractors by financial, technical, and administrative capabilities.

  • Mandatory Registration: All Dubai contractors must register with the Contractors Classification Committee by December 31, 2026 (one-year transition period)
  • Classification Tiers: Contractors will be assigned to specific categories limiting project types and values they can undertake
  • Restrictions: Working outside your classification or subcontracting without approval results in penalties
  • New Entrants: Start at the lowest classification tier and must demonstrate capacity to move up

⏰ Critical Deadline: December 31, 2026

Dubai contractors must complete classification registration by year-end 2026. Failure to register may result in inability to bid on new projects or renew existing contracts. Prepare financial statements, technical certifications, and organizational documents now.

E-Invoicing Implementation (July 2026)

The FTA is rolling out mandatory e-invoicing for VAT-registered businesses starting July 2026. Contractors must issue electronic tax invoices in a structured digital format.

  • Phase 1 (July 2026): Large taxpayers (AED 100M+ revenue) must comply
  • Phase 2 (2027): All VAT-registered businesses
  • Requirements: E-invoices must include QR codes, digital signatures, and real-time submission to FTA portals
  • Software Readiness: Ensure your accounting software supports FTA-compliant e-invoice generation

2026 Corporate Tax Key Dates

Mark these critical Corporate Tax deadlines:

  • March 31, 2026: Natural persons conducting business must register for Corporate Tax
  • 9 months after financial year-end: Corporate Tax return filing deadline (e.g., December 31 year-end β†’ September 30 filing)
  • Quarterly Provisions: Calculate and book CT provisions every quarter for accurate financial reporting
  • Transfer Pricing Documentation: Prepare contemporaneous transfer pricing reports for related-party transactions before filing deadline

VAT Compliance 2026

Key VAT changes and deadlines:

  • Quarterly VAT Returns: Due within 28 days of quarter-end (Jan 28, Apr 28, Jul 28, Oct 28)
  • 5-Year Claim Limit: New rule effective Jan 1, 2026 β€” excess refundable VAT must be claimed within 5 years of the relevant tax period
  • Self-Invoicing Changes: No longer required for reverse charge transactions; retain supplier invoices instead
  • Annual Reconciliation: Reconcile VAT returns with audited financial statements before filing Corporate Tax return

Economic Substance Regulations (ESR)

If your contracting business conducts "relevant activities" (most don't apply to construction), file ESR notifications and reports by deadline:

  • Notification: Within 6 months of financial year-end
  • ESR Report: Within 12 months of financial year-end (if conducting relevant activities)
  • Penalties: AED 20,000 for late notification, AED 50,000 for late/non-filing of reports

πŸ“… Monthly Compliance Checklist

Month-End: Close books, reconcile bank accounts, review project WIP schedules
Quarterly: File VAT return, calculate CT provision, review cash flow forecast
Annually: Prepare audited financials, file CT return, renew trade licenses, update ESR notifications

Frequently Asked Questions

Do UAE contractors need an annual audit?

It depends on your legal structure and revenue threshold. Mainland LLCs with revenue exceeding AED 50 million typically require a statutory audit. Free Zone companies follow their respective regulatory requirements.

How long must contractors keep accounting records?

The FTA mandates maintaining all accounting records, tax invoices, and supporting documents for at least 5 years from the end of the relevant tax period. Records must be in Arabic or English.

What's the penalty for late VAT filing in the UAE?

Late filing penalties start at AED 1,000 for the first offense, AED 2,000 for repeat offenses within 24 months. Late payment penalties accrue at 4% per month on the outstanding VAT amount.

Are Free Zone contractors exempt from Corporate Tax?

Qualifying Free Zone Persons (QFZPs) may benefit from 0% CT on qualifying income. However, this requires meeting strict conditions including adequate substance, proper record-keeping, and earning qualifying revenue only. Learn more about Free Zone accounting services.

Can Pro Tax Accountant help prepare for an FTA audit?

Yes. Our certified team conducts pre-audit health checks, prepares compliance files, reconciles VAT returns with general ledgers, and represents you during FTA interactions.

What accounting software is FTA-approved for UAE contractors?

The FTA maintains an accredited software vendors list. Popular options for contractors include Tally, Zoho Books, QuickBooks, and specialized construction ERPs. Choose software with job costing, progress billing, and VAT compliance features.

How do I account for retention money in construction projects?

Record retention receivables separately from standard AR. Only recognize VAT when retention is released, not when withheld. Mirror this treatment for retention you withhold from subcontractors. Track retention aging to ensure timely collection post-project completion.

What's the difference between progress billing and milestone billing?

Progress Billing: Invoice based on percentage of work completed (e.g., monthly based on actual costs incurred). Milestone Billing: Invoice when specific deliverables are achieved (e.g., foundation complete, MEP rough-in done). Both comply with IFRS 15 if properly documented.